Wrike — connecting

Connect Wrike to Taskloc via OAuth — tasks by project folder, comments, statuses, priority and time in hours on a date; address and mileage need a paid plan

Updated:

The Wrike connector shows the tasks of your Wrike account and lets you comment on them, change their status and priority, and write time. The role of a project in the app is played by a Wrike project folder.

Address and mileage depend on your Wrike plan. The app reads them from task custom fields, and Wrike's free Free plan has no custom fields — then there is neither address nor mileage. Tasks, statuses, comments and time entries do not depend on the plan.

How to connect

Wrike is connected from integrations only — it is not in the tracker list at first sign-in.

  1. In the app, open Settings → Add tracker (with several organizations — Settings → All trackers (N) → Add tracker).
  2. Choose Wrike.
  3. Tap Sign in with Wrike — a browser window opens to sign in to Wrike. No address to enter: the cloud is www.wrike.com, and Wrike itself reports an account in its European data center after sign-in.
  4. Sign in to Wrike and allow access.

Access inherits every permission of your Wrike user — it cannot be narrowed to specific rights. The tokens are stored on the device; the Taskloc server only exchanges the sign-in code and refreshes the token without keeping them.

What is supported

FeatureStatus
Viewing tasks by project folder✅
Creating a task✅ — in the folder chosen in the integration settings (details)
Comments✅
Changing the status✅ (Wrike workflow status)
Priority✅ (Low, Normal, High)
Writing time to Wrike✅ — in hours, on a date without a time of day
Assignee❌ — not shown on the card and not changed
Tags❌
Attachments (files and photos to a task)✅
Auto-pause— (the pause is recorded in Taskloc only)

Integration settings

The Wrike integration settings have a Wrike: creation and status auto-change block:

  • Folder for new tasks — where the "+" button on the task list puts a new task. Until a folder is chosen, creating a task is refused with "The quick-create folder is not configured in the Wrike integration".
  • Auto-change statuses have no separate fields here: they are chosen in the shared status lists of the Task Management block above — as with other trackers.

Wrike specifics

  • Statuses are picked from a list; you do not type their names. If no start status is selected, the status is left unchanged at that step. Wrike does not translate the names of its standard statuses: they are New, In Progress, Completed even in a localized interface.
  • The completion status can stay unselected. The task is then closed with the first status of the Completed group; a choice is only needed to close with a specific status.
  • Time is written as hours on a date. The start and end of the interval are not sent to Wrike, only the duration and the date — a session across midnight lands entirely on one day.
  • Tracker field — the custom field id, not its name: the address is a Text field, the mileage is a Numeric field. See Tracker fields.

Compatibility

  • Cloud Wrike (www.wrike.com), including accounts in the European data center.