Wrike — connecting
Connect Wrike to Taskloc via OAuth — tasks by project folder, comments, statuses, priority and time in hours on a date; address and mileage need a paid plan
Updated:
The Wrike connector shows the tasks of your Wrike account and lets you comment on them, change their status and priority, and write time. The role of a project in the app is played by a Wrike project folder.
Address and mileage depend on your Wrike plan. The app reads them from task custom fields, and Wrike's free Free plan has no custom fields — then there is neither address nor mileage. Tasks, statuses, comments and time entries do not depend on the plan.
How to connect
Wrike is connected from integrations only — it is not in the tracker list at first sign-in.
- In the app, open Settings → Add tracker (with several organizations — Settings → All trackers (N) → Add tracker).
- Choose Wrike.
- Tap Sign in with Wrike — a browser window opens to sign in to Wrike. No address to enter: the cloud is
www.wrike.com, and Wrike itself reports an account in its European data center after sign-in. - Sign in to Wrike and allow access.
Access inherits every permission of your Wrike user — it cannot be narrowed to specific rights. The tokens are stored on the device; the Taskloc server only exchanges the sign-in code and refreshes the token without keeping them.
What is supported
| Feature | Status |
|---|---|
| Viewing tasks by project folder | ✅ |
| Creating a task | ✅ — in the folder chosen in the integration settings (details) |
| Comments | ✅ |
| Changing the status | ✅ (Wrike workflow status) |
| Priority | ✅ (Low, Normal, High) |
| Writing time to Wrike | ✅ — in hours, on a date without a time of day |
| Assignee | ❌ — not shown on the card and not changed |
| Tags | ❌ |
| Attachments (files and photos to a task) | ✅ |
| Auto-pause | — (the pause is recorded in Taskloc only) |
Integration settings
The Wrike integration settings have a Wrike: creation and status auto-change block:
- Folder for new tasks — where the "+" button on the task list puts a new task. Until a folder is chosen, creating a task is refused with "The quick-create folder is not configured in the Wrike integration".
- Auto-change statuses have no separate fields here: they are chosen in the shared status lists of the Task Management block above — as with other trackers.
Wrike specifics
- Statuses are picked from a list; you do not type their names. If no start status is selected, the status is left unchanged at that step. Wrike does not translate the names of its standard statuses: they are
New,In Progress,Completedeven in a localized interface. - The completion status can stay unselected. The task is then closed with the first status of the Completed group; a choice is only needed to close with a specific status.
- Time is written as hours on a date. The start and end of the interval are not sent to Wrike, only the duration and the date — a session across midnight lands entirely on one day.
- Tracker field — the custom field id, not its name: the address is a Text field, the mileage is a Numeric field. See Tracker fields.
Compatibility
- Cloud Wrike (
www.wrike.com), including accounts in the European data center.